MM1313亚洲国产精品无码试看,日本高清少妇japanesevideo,亚洲毛片ΑV无线播放一区,国产AV旡码专区亚洲AV苍井空

NHI Headlines

NHI’s TBM creates a successful open for the extension line between Beijing and Tianjin

Published:2015-04-07

Recently, that the Φ11.97m slurry balance TBM calledNO. 45 of SHMG emerged through 18 months work. It marks the successful open for the extension line between Beijing and Tianjin, which is the national key construction project in China.

The full length of the extension line between Beijing and Tianjin is 44.815 kilometers, for the only one TBM tunnel with 2.8 kilometers; the Φ11.97m bentonite slurry balance TBM with air cushion type from our company is used in the part of 2.25 kilometers. The installed total power of the equipment is 3960kw. The length of main body is 50 meters and the weight is 1300 tons.

It creates another successful achievement after that NHIs TBM is used in the national projects of high-speed rail SHIZIYANG tunnel between Guangzhou and Shenzhen, Wuhan river tunnel as the first tunnel of Yangtze River, the railway underground line for Beijing and Tianjin in China. 

茌平县| 唐河县| 灵寿县| 巩留县| 台南市| 秦皇岛市| 正镶白旗| 同心县| 朝阳市| 华亭县| 北安市| 乌兰县| 漯河市| 梓潼县|