MM1313亚洲国产精品无码试看,日本高清少妇japanesevideo,亚洲毛片ΑV无线播放一区,国产AV旡码专区亚洲AV苍井空

Electrical Control System of Double-inlet and Double-outlet Coal Mill

Electrical control system of double-inlet and double-outlet coal mill includes low voltage cabinet for control auxiliary equipment, electrical ear measurement device for controlling and monitoring material position and differential pressure measurement device. Low voltage PLC cabinet is the core of control system control and monitors, the mill operation through receiving the entire signal and transmitting the signal to center control DCS system by bus interface. With the ladder diagram program required by equipment production technology, according to the input command signal, PLC shall judge and logical process and send relevant command to make sure all the parts of mill operate efficiently. 

 

NHI double-inlet and double-outlet coal mill electrical control system with advanced automatic control equipment can achieve the following function; mill can operate safely and continuously around 300 days with no faults. During the running of mill, wearing parts can be filled in with mill non-stop, and mill can response fast according to load variation. Mill can realize double-inlet and double-outlet, single-inlet and double-outlet and semi-grinding according to the requirement of boiler load. More than 400 NHI production coal mill electrical systems are in safe operation in the coal-fire power field in Southeast Asia and North America.

老河口市| 皮山县| 江川县| 新疆| 碌曲县| 延庆县| 体育| 栾川县| 城固县| 定远县| 勐海县| 阳泉市| 吉首市| 左贡县|